Shanxi Steel Or Large Area Will Stop Production For Three Days, Supply Contraction Is Obvious
At present, Shanxi steel production is at the peak, inventory has been increased for six consecutive weeks, mainly due to the obvious off-season effect of the market, the terminal demand is in a weak position, resulting in the continuous decline of steel prices, and the high price of raw materials, making the cost of steel mills on the high side, steel mills said that has been at a loss or loss edge.
Now according to the market news, Shanxi steel mill sintering on June 29 - July 1 all production, blast furnace will also be braise furnace for three days, after learning this news, my network has communicated with the person in charge of the steel plant, determined to receive this news, and this news is only the local environmental protection departments oral notice related enterprises.
According to the estimation of molten iron output of the sample steel plant of MySteel, the daily affected amount is 136,000 tons, and the total amount of the shutdown is 408,000 tons for three days. Due to the shortage of molten iron and gas, the rolling line will also be affected, with the daily average steel output of 143,000 tons and the total amount of the shutdown of 429,000 tons for three days, among which the construction steel output is estimated to be 398,000 tons.
At the same time, we communicate with the terminal enterprises, so far the terminal has not received the notice of shutdown, but do not rule out the possibility of slowing down the purchase amount due to the financial pressure at the end of the month, according to the current situation of obvious supply contraction, good for the current steel market.
At present, the number of blast furnaces in Shanxi is 46, and the number of blast furnaces in operation is 44, with the operating rate of 95.6%.
The weekly capacity of blast furnace is 995,000 tons, and the weekly capacity utilization rate of blast furnace is 95.6%.
Thread: the current number of thread equipment is 24, the number of equipment in operation is 23, the operating rate is 95.8%;
The weekly capacity of screw thread is 460,500 tons, and the weekly capacity utilization rate is 94.1%.
In terms of rewinding: the current number of rewinding equipment is 30, the number of started equipment is 28, the operating rate is 93.3%, the weekly capacity of rewinding is 565,000 tons, and the weekly capacity utilization rate is 88.0%.
Short comments: The contraction of steel output is bound to affect the price of steel. Now the exchange rate between US dollar and RMB is favorable for our export. Welcome customers to inquire now.
The Ways Of Delivery CargosJune 30, 2022There are many ways to transport goods in foreign trade, mainly including ocean transport, railway transport, air transport, river transport, postal transport, road transport, pipeline transport, land...view
What Are the Recommended Colors for Steel Drum in Global Market?January 3, 2023The latest recommended color standard for steel drums issued by the International Steel Drum Organization, among which the ICDM steel drum color standard has been affirmed by many parties and recommen...view
Issuing Of The Latest Standards For SprayingJuly 4, 2022Since February 1, 2021, will formally begin to implement the national standard "low volatile organic matter content coating product technical requirements", to the industrial protection of w...view
The Development Trend Of Metal Packaging ContainersJuly 1, 2022(1) Steel drum structure①The steel drum is lined with bag. The steel drum liner bag is to put the liner bag in a thousand steel drums. It combines the characteristics of two packaging materials at th...view